Department dashboard
Quick indicators for the current browser session. Counts update as linemen generate reports from this device.
Scheduling fields from spreadsheet
The uploaded workbook contained one scheduling template sheet. These are the fields reflected in the report form below.
| Project Description | Date Design Complete | Major Materials Needed | Date Requested | Committed Dates | Actual Dates | Locates | Permits | Comments |
|---|---|---|---|---|---|---|---|---|
| Describe service work, repair, new install, outage response, or maintenance project. | When engineering/design was completed. | Poles, wire, transformer, conduit, meter base, hardware, or specialty equipment. | Date customer, office, or supervisor requested the work. | Start Date Committed and End Date Committed. | Start Date Actual and End Date Actual. | Whether locates are required before digging. | Whether permits are required before work proceeds. | Field notes, safety concerns, customer communication, and closeout details. |
Lineman photo and report submission
Fill out the work details, attach job-site photos, then generate a report. Photos are previewed in the browser and included in the printable report.
Scheduling calendar
Create a calendar event from the report form schedule dates, then add it to Google Calendar or download an ICS calendar file.
Visual job calendar
Jobs are placed on their committed or actual start date as they are created.
No calendar events created yet.
Job reports dashboard
Generated reports are saved locally in this browser and grouped into completed jobs and future jobs. The pie chart summarizes reports by Project Description.
Project Description Breakdown
Completed Jobs
0No completed job reports yet.
Future Jobs
0No future job reports yet.
Generated field report
After submission, the completed report appears here for printing, saving as PDF, copying, or downloading as a JSON record.
Ava MO Electric Department Field Report
No report generated yet. Complete the form above and select “Generate report.”